Skip to product information
1 of 1

I5 Electric Supply

SQUARE D SCHNEIDER EZM1600TB 600 AMP SINGLE PHASE EZM METER MAIN LUGS TERMINAL BOX TAP BOX

SQUARE D SCHNEIDER EZM1600TB 600 AMP SINGLE PHASE EZM METER MAIN LUGS TERMINAL BOX TAP BOX

Regular price $2,899.00 USD
Regular price Sale price $2,899.00 USD
Sale Sold out
Square D EZM1600TB single phase 600A terminal box / tap box. This main lugs terminal box can be feed from an overhead or underground service. This EZ Meter Pak is designed with a rated operational voltage of 120/240 VAC single phase 3W in and out. The unit has an aluminum horizontal cross bus bar. The main is rated 600 A. The electrical lug connections on the line side will accept two 1/0 to 750 kcmil copper or aluminum wires. The electrical lugs on the line side will also accept four 1/0 to 300 kcmil copper or aluminum wires. This unit has a NEMA 3R surface mounting enclosure that is 30.46 inches tall, 17.15 inches wide and 7.09 inches deep. This main lugs terminal box unit is UL Listed.

Note: 

1. Though this is a brand-new item, and, we will add additional carton outside its original manufactory's carton packing. Due to its heavy weight and potential long transportation.  Some minor cosmetic imperfections might occur, such as minor scratches, tiny paint offs etc.  By ordering this item, you agree to accept those potential minor cosmetic imperfections if any, in which will not affect to its operational functionalities.

2. Item will be shipped with insurance and signature required. Please make sure someone will be at destination address to exam and sign the package.

3. If you are not sure, please consult serving utility for their requirements prior to ordering and installing, as specifications and approvals vary by utility and may require local electrical inspector approval. All installations must comply with all national and local codes, laws and regulations. By ordering this item, you acknowledge that you already done your due diligence, fully understand installation requirements, confirmed with power/utility company and inspector for their approvals or fully understand the risks if you haven't done that yet and willing to take risk on your own.


View full details